| Portugal • Extending the lifespan of the Luiz I bridge, Porto | |||
| ECCS
Awards for steel bridges 2008 Click on thumbnail for a larger image - Klicken sie auf die bilder um sie zu vergrössern - Cliquez sur les images pour les agrandir
![]()
Upper deck 390m long supported by seven piers and an arch with a span of 174 m for a rise of 45 m. The shape of original elements reflects its structural function, an aspect to be preserved for the benefit of aesthetics and historical heritage. New steelworks material: 1 100 t (10% for solving damaged parts). ECCS Awards for steel bridges 2008 Jury's comments: This renovation of an outstanding historical bridge, built in the end of the 19th century by Theophile Seyrig, Eiffel's former associate, is distinguished for the very careful attention taken to the old riveted structures, which integrity has been maintained, and the use of modern technology to strengthen and bring this bridge to a new life. | |||
|
Photos: DR | back | ||
ECCS-CECM-EKS - 32, av. des Ombrages, bte 20 - 1200 Brussels - Belgium - Tel.: +32-2/762.04.29 - Fax: +32-2/762.09.35 - E-mail: eccs@steelconstruct.com | |||