Footbridge Over the "Rhein-Herne-Channel" in Gelsenkirchen • Germany, 2009

Click on thumbnail for a larger image - Klicken sie auf die bilder um sie zu vergrössern - Cliquez sur les images pour les agrandir
Footbridge Over the "Rhein-Herne-Channel" in Gelsenkirchen. Plan. © Schlaich Bergermann und Partner. Footbridge Over the "Rhein-Herne-Channel" in Gelsenkirchen. Assembly of the superstructure. © Schlaich Bergermann und Partner. Footbridge Over the "Rhein-Herne-Channel" in Gelsenkirchen. © Schlaich Bergermann und Partner Footbridge Over the "Rhein-Herne-Channel" in Gelsenkirchen. Main cable anchorage. © Schlaich Bergermann und Partner Footbridge Over the "Rhein-Herne-Channel" in Gelsenkirchen. Aeroplates. © Schlaich Bergermann und Partner Footbridge Over the "Rhein-Herne-Channel" in Gelsenkirchen. saddle clamps. © Schlaich Bergermann und Partner Footbridge Over the "Rhein-Herne-Channel" in Gelsenkirchen. Abutment. © Schlaich Bergermann und Partner Footbridge Over the "Rhein-Herne-Channel" in Gelsenkirchen. View from the South.  © Schlaich Bergermann und Partner Footbridge Over the "Rhein-Herne-Channel" in Gelsenkirchen. © Schlaich Bergermann und Partner Footbridge Over the "Rhein-Herne-Channel" in Gelsenkirchen. Early morning view. © Schlaich Bergermann und Partner.
Client : RVR-Regionalverband Ruhr
Architect(s): Schlaich Bergermann und Partner-Sbp

Engineering: Schlaich Bergermann und Partner-Sbp
Steelwork Contractor(s): Stahlbau Raulf

More infos: www.sbp.de Type: Footbridges

Description: The new suspension bridge crosses the Rhein-Herne Canal in a broad gesture. The curved steel superstructure with a main span of 141m is suspended on the outer edge of the cross section by a cable structure fixed to a 45 m high mast at the northern bank. The main cables are anchored tangentially in the deck roughly 24 m before the abutments: the connection does not have additional support. 30 stainless steel hanger cables every 3 m are connected to the main suspension cables by machined clamps. In order to reduce the length of the central hanger cables, a secondary, garland-shaped suspension cable runs between the main suspension cables at midspan.

back
ECCS-CECM-EKS - 32, av. des Ombrages, bte 20 - 1200 Brussels - Belgium - Tel.: +32-2/762.04.29 - Fax: +32-2/762.09.35 - E-mail: eccs@steelconstruct.com

legal notice This site is developped by Cedam (webmaster) for ECCS
steelconstruct.com, the european portal dedicated to steel in construction and architecture