sda 1999 - Austria : The new dome of the former german Reichstag, Berlin

Owner : Federal Republic of Germany
Architects : Foster & Partners, London - Berlin
Structural Engineer : Leonhardt Andrä und Partner, Stuttgart
Prüfingenieur : Dr W Stucke, Berlin
Acoustic consultant : Müller - BBM, München
Constructors : Waagner-Biró Binder Aktiengesellschaft, Gleisdorf

This remarkable design benefits the use of steel in architecture by permitting thin curved steel ribs and a glass cladding system for a dome structure with internal perimeter walkways, lighting and ventilating in a monumental historic building.

sda 1999 - Belgium : Donzere-Mondragon Double Bow-sting Bridge for TGV

Owner: SNCF
Architect: Marc Mimram
Engineer: Marc Mimram ingenierie, R. Foucault & Associés, Greisch
Steelwork contractor: Victor Buyck Steel Construction (www.buyck.be), Eiffel CM (www.eiffel.fr)

The strong image of the project heralds the return of steel to high speed railway bridge construction. This pair of simple bowsring arches is unconventionally linked by the high stabilizing struts to achieve a particuliarly stiff railway surface with competitive steel weight and clean detailing.

sda 1999 - Czech Republic : Mariánský bridge, Ústí nad Labem

Owner : City of Usti nad Labem
Architect : Roman Koucký architects, Prague
Engineer : Dipl. In Milan Kominek, Prague
Engineering : Vitkovice, as, Ostrava - CityPlan Ltd, Prague
Constructor : Hutni Montaze, as, Ostrava - Vitkovice, as, Ostrava - SSZ, as, Prague

The distinctive profile of the pylon portal gate is inspired by the distribution of the tensile suspension forces of the deck and is an elegant expression of steel's scultural potential..

 
 2005 - 2003 - 2001 - 1999 - 1997